NetSuite for manufacturers: BOMs, stock and lead times
When products are built from assemblies inside assemblies, simple questions get hard in NetSuite: how many can we build today, and how long will 500 take? I build the bill of materials, stock and lead-time logic that answers them.
What gets fixed
Nested bills of materials
How many of each part go into one product, three levels down? Multi-level BOMs are flattened into one table, so each part's total quantity per product is known.
What you can actually build
How many can we ship if we build the rest today? Buildable stock is worked out from the components on hand, not just from the finished goods on the shelf.
Quotes with the wrong lead time
How long will an order of 500 take compared with 50? Lead times are worked out for each order size, and the quote and the web store always show the same date.
BOM changes that break the numbers
What happens when engineering changes a BOM? The change is flagged, and the totals, buildable stock and lead times are worked out again from the new version.
Costs that miss freight and duty
Do your product costs include what it took to get the parts in? Landed cost adds freight and duties to the cost of the items they were paid for, per receipt.
Supplier bills that don't match the order
Are you paying for more than you ordered? Each supplier bill is checked against what's still open on the purchase order before anyone approves it for payment.
Built for a millimeter-wave components manufacturer
A manufacturer of millimeter-wave components sells through a web store and through quotes. Most of its products are assemblies made from other assemblies. The stock of finished products says little about how many it can ship. The real answer is in the parts several levels down.
I built the engine in NetSuite that works this out. It goes through every bill of materials down to the last part, works out how many of each product can be built from what's in stock, and calculates how long an order takes at each order size. When engineering changes a bill of materials, everything is worked out again.
Customers see what can ship, and when, on the web store. Sales quote from the same figures, and a scheduled stock report shows the team the full picture.
At Folio3 I also built purchase checks for a medical device maker: a supplier bill can't be entered for more than what's still open on its purchase order. For three importers I've built landed cost, which allocates freight and duty to the goods received, so inventory and margins carry the full cost.
- CLIENT
- Millimeter-wave components manufacturer
- SYSTEMS
- NetSuite and its SuiteCommerce web store
- STOCK
- Counted from the parts on hand
- LEAD TIMES
- For every order size
- UPDATES
- Whenever a bill of materials changes
- USED BY
- Web store, sales quotes, stock report
- ALSO BUILT
- Purchase checks for a medical device maker, landed cost for three importers
How we can work together
For companies running NetSuite
01BOM, stock and costing setup
Bills of materials, assemblies, buildable stock, lead times and landed cost, set up or fixed in your NetSuite account. Scoped and quoted up front.
02Fixing the one you have
Your BOMs, stock or product costs don't add up. I find out why, then fix it or replace it, whichever costs you less.
For NetSuite partner firms
01White-label delivery
I build the manufacturing side of your client's project under your brand, inside your tooling and process. Your client sees one team, and you keep the relationship.
Questions
Does NetSuite handle multi-level bills of materials?
Yes. Assemblies can contain other assemblies, and with Advanced BOM each bill of materials is its own record with revisions and effective dates, and an assembly can have several BOMs (Oracle's documentation). Reports that need the total quantity of each part across every level are where a flattened table helps.
Does NetSuite plan production and purchasing?
Yes. NetSuite's planning run creates planned work orders, purchase orders and transfer orders from demand, BOMs and lead times, and planners firm them in the Planning Workbench (Oracle's documentation). Work orders, work in progress and routings cover the shop floor.
What happens when a BOM changes?
The changed BOM is flagged, and the flattened totals, buildable stock and lead times are worked out again, so quotes and the web store never use old numbers.
What does landed cost do for a manufacturer?
It adds freight, duty and other import costs to the cost of the items they were paid for, so product costs and margins reflect what the parts really cost you.
Do you also connect the web store and warehouses?
Yes. See Shopify to NetSuite and 3PL, warehouse and EDI.
How do we start?
Book a 30-minute call and tell me how your products are built and costed today. I'll tell you what I'd look at first.
Can't tell how many
you can build today?
// I reply within one business day.